BIL  NO.SEBUTHARGA 

KETERANGAN ASET

                    

              KUANTITI                              

  

 HARGA SEMASA      
    DEPOSIT HARGA             
     TARIKH/MASA    
TEMPAT  HARGA   

 

1.

 

PHN.NS.

13/2017

ISUZU TROPPER UBS 69-NBG5209 1

RM 6,000.00

5 %

04 OGOS 2017
SEHINGGA
18 OGOS 2017

 

9.00 PAGI - 4.30 PTG

TAPAK SEMAIAN MANTIN. NEGERI SEMBILAN RM30.00